Update On Third Mainland Bridge Repairs (Week 6)

Posted by E.L.E.X on August 30 2020 under News









Its week 6 and rehabilitation is ongoing on the third mainland bridge.

The steel in the first joint has been fixed, and we are right on schedule.

Each joint repair involves a long process which must be done with precision and care to make sure the bridge is safe for all users upon completion.

Next week we will speak to some of our road users. Stay with us @tmbrehab #tmbrehab

Watch Video




YOU MAY ALSO LIKE

Related Posts Pictures

''After talking to them, they are now lowering their bar''- Sheik Gumi says bandits will no longer kill abducted Greenfield university students

Related Posts Pictures

See the Historical photos of the life and times of Prince Philip as the world continues to mourn the late Duke of Edinburgh (PHOTOS)

Related Posts Pictures

DSS Operatives Accused Of Killing A Teenager Who Tried To Rescue A Drunk (Graphic)

Related Posts Pictures

Bishop Oyedepo rains curses on Miyetti Allah, Boko Haram, others after failed attempt to bomb his church in Kaduna

Related Posts Pictures

Eucharia Anunobi recounts how a hotel cleaner at a church camp allegedly used a toilet brush to wash glass cups

Comments


Add Comment

All fields are required!








Contact Us Picture

Are you interested in Advert placement | Promoting your Music or Video | Other Enquiries? We are always available to get that done for you without breaking a sweat. Send us a mail @ elextechnologies4@gmail.com | Call us @ 08132021949 | Message us via whatsapp @ 08132021949